Peters Twp Public Library Addition
Peters Township Public Library Homepage
Peters Township Public Library
Blog Archive
▼
2008
(22)
▼
May
(4)
5/13/08
5/12/08
5/9/08
5/8/08
►
April
(18)
4/13/08
4/13/08
4/13/08
4/13/08
3/31/08
3/12/08
3/11/08
2/13/08
2/7/08
2/5/08
2/1/08
1/18/08
1/7/08
12/31/07
12/23/07
12/20/07
12/19/07
11/30/07
►
2007
(50)
►
December
(2)
11/21/07 Putting up a retaining wall in the front ...
11/17/07 Putting up retaining walls in the back.
►
November
(12)
11/14/07 Work on second floor inside.
11/7/07 Installing new window frames.
11/2/07 Facade finished, scaffolding taken down.
11/2/07 Facade almost completed.
10/29/07 More work on the EIFS.
10/24/07 Working on the EIFS. Scoring on the EIFS....
10/23/07 EIFS installed all around.
10/22/07 Instaling EIFS (Exterior Insulation Finis...
10/18/07 Topping off the brick facade and a peek i...
Working around the windows.
Insulation around the window areas.
Laying down the tarpaper.
►
October
(36)
10/12/07 Working on the roof.
10/11/07 Skeleton of the roof in place.
10/10/07 Stacks of roof parts ready for installati...
10/9/07 Construction site from a distance.
10/5/07 Working inside.
10/2/07 Brick facade built higher, pouring concret...
10/1/07 Work on the front wall.
9/28/07 Work on the Brick Facade.
9/27/07 Steel beams in place.
9/26/07 Preparing to place 2nd story steel beams
9/25/07 Taking out the old windows.
9/24/07 Starting the new brick facade
9/21/07 Front wall rising higher.
9/20/07 Front wall rising.
About Me
Peter Stamoolis
View my complete profile
Thursday, May 15, 2008
5/13/08
Half of Young Adult collection on the new shelves.
5/12/08
New shelving being set up for Young Adult and special collections on second floor.
5/9/08
Shelf extensions going up.
5/8/08
Posts for shelf extension of existing shelves on 2nd floor
Monday, April 21, 2008
4/13/08
Action at a video game station.
4/13/08
Children playing.
4/13/08
Ribbon cutting as a group effort.
Older Posts
Subscribe to:
Posts (Atom)