Monday, November 26, 2007


11/14/07 Work on second floor inside.

11/7/07 Installing new window frames.

11/2/07 Facade finished, scaffolding taken down.

Friday, November 23, 2007


11/2/07 Facade almost completed.

10/29/07 More work on the EIFS.

Wednesday, November 14, 2007




10/24/07 Working on the EIFS.


Scoring on the EIFS.

10/23/07 EIFS installed all around.

10/22/07 Instaling EIFS (Exterior Insulation Finish System, pronounced EEFIS), the white material above the brick.






10/18/07 Topping off the brick facade and a peek inside.

Moving the insullation to the 2nd floor.


Monday, November 5, 2007


Working around the windows.

Insulation around the window areas.

Laying down the tarpaper.