10/12/07 Working on the roof.
10/11/07 Skeleton of the roof in place.
10/10/07 Stacks of roof parts ready for installation.
10/9/07 Construction site from a distance.
10/5/07 Working inside.
10/2/07 Brick facade built higher, pouring concret...
10/1/07 Work on the front wall.
9/28/07 Work on the Brick Facade.
9/27/07 Steel beams in place.
9/26/07 Preparing to place 2nd story steel beams
9/25/07 Taking out the old windows.
9/24/07 Starting the new brick facade
9/21/07 Front wall rising higher.
9/20/07 Front wall rising.
9/19/07 Starting the front wall.
9/18/07 Wall topped off.
9/17/07 Outlines of 2nd floor windows.
9/14/07 More work on the walls.
9/13/07 Walls are higher still.
9/12/07 Walls now higher.
9/11/07 The walls are rising.
9/10/07 Stacks of cement blocks and building the w...
9/7/07 Brick facade gone and scaffolding up.
9/6/07 Assembling the scaffolding.
9/5/07 Beginning to strip off the brick facade.
9/4/07 Pouring concrete
8/31/07 Concrete pad preparations - reinforcement ...
8/27/07 Preparing for the concrete pad.
8/20/07 Laying the foundation
8/14/07 More foundation digging
8/6/07 A trench for the foundation
8/2/07 Dug Out
7/31/07 More excavation
7/27/07 Excavation continues
July 25, 2007 Excavation starts.
On July 14, 2007 ground was broken for a 4,818 squ...
About Me
Peter Stamoolis
View my complete profile
Tuesday, October 16, 2007
9/7/07 Brick facade gone and scaffolding up.